|
Projects
Stormwater Pump Stations
Pump Station No. 7Wellington, Florida
Mock•Roos provided the planning, surveying, design, and construction administration services for Wellington's Stormwater Pump Station No. 7 project. As part of Wellington's Basin B Long.... (more)
Pump Station No. 9Wellington, Florida
Mock•Roos provided the planning, surveying, design, and construction administration services for Wellington's Stormwater Pump Station No. 9 project. Pump Station No. 9 is a 90,000 gpm stormwater pump station th.... (more)
Mirasol Development Surface Water Control and Pump StationsPalm Beach Gardens, Florida
Mock•Roos provided the planning, design, permitting and construction administration services for the Mirasol Development stormwater facilities. The development is a 2,300-acre residential, wetland and commercial development, including two golf courses. The storm.... (more)
PGA National Central Stormwater Pump Station RenovationPalm Beach Gardens, Florida
Mock•Roos provided the planning, design and construction administration services for the rehabilitation of this 30+ year old 110,500 gpm pump station which provides the primary flood protection for the PGA National Community. Mock•Roos had provided the or.... (more)
Renaissance Project Stormwater Pump Stations and StructuresWest Palm Beach, Florida
Mock•Roos provided the planning, design, permitting and construction administration services for the City's award winning Renaissance stormwater facilities. The Project's primary purpose is to provide stormwater flood protection for a local drainage basin with.... (more)
Replacement of Stormwater Pump Station Nos. D6, D7 and D15Palm Beach, Florida
Mock•Roos provided the planning, surveying, design, and permitting services for replacement of the Town's two largest pump stations - both 114,000 gpm in capacity. The existing pump stations are located in the high profile Lakeside Park on the Intracoastal Waterway. This project was originally designed by Moc.... (more)
Surface Water Control (Pump)Structure No. 2West Palm Beach, Florida
Mock•Roos provided the planning, design, and permitting, services for the City's Control Structure No. 2 replacement project. Control Structure No. 2 is located west of Seminole Pratt Whitney Road at the end of the L-8 Tieback Canal. The control structure withdraws fresh water from the L-8 canal and pumps it downstream into.... (more)
Automated Trash Removal SystemWellington, Florida
Wellington has had a historical problem with aquatic weed (trash) removal from their hundreds of miles of interconnecting canals located in residential areas throughout their drainage system. The trash often prohibits operation of their numerous flood protection pump stations - requiring an ope.... (more)
Surface Water Control Structures
Surface Water Control Structure No. 4West Palm Beach, Florida
Mock•Roos provided the planning, design, permitting, value engineering and construction administration services for the City's Control Structure No. 4 replacement. Control Structure No. 4 is located in the M-Canal just west of Haverhill Road and south of 45th Street. This structure is the primary control mechanism for pas.... (more)
Basin B (Pierson Road) Control StructuresWellington, Florida
Mock•Roos provided the planning, surveying, design, permitting and construction administration services for Wellington's five Stormwater Control Structure Improvements project. As part of Wellington's Long Range Basin B Plan, this project was constructed, in conjunction with Stormwater Pump Station No. 8, to increase the inter.... (more)
Emergency Stormwater Control StructureVarious locations in Palm Beach County, Florida
Mock•Roos provided the planning, design and construction administration services for several emergency stormwater control structures. During October 1995, the northern portion of Palm Beach County received over 20 inches of rainfall within a three day period. This resulted in extensive flooding of homes and roadways. Many of the seco.... (more)
Large Scale Surface Water Management Projects
Renaissance Project - Turning Urban Stormwater Runoff into an Alternative Water SourceWest Palm Beach, Florida
The Renaissance Project showcases Mock•Roos' commitment to thinking comprehensively about water resources - turning stormwater runoff into an alternative water supply source. The FASWWA award-winning project encompasseswater supply, stormwater quality, and flood protection components, all within the footprint of a single urban retrofit project. Moc.... (more)
Wellington's Basin B Stormwater Improvements PlanWellington, Florida
The Wellington Basin B Plan (Plan) is the product of over a decade of dedicated and sound civil engineering (by Mock•Roos) implemented under the partnership and cooperation of two governmental entities -Wellington and SFWMD. The Plan represents a major step forward in the conservation and protection of the natural resources and water quality in the Florida Ever.... (more)
Scripps Biotechnology ParkPalm Beach County, Florida
Mock•Roos, as a sub-consultant, was responsible for the planning, successful permitting and designing of the surface water management system to serve the 1,920-acre mixed-use development called the Biotechnology Research Park for the Scripps Research Institute. Mock•Roos developed an AdICPR computer model of the surface water ma.... (more)
Surface Water Resource / Conveyance Modeling and StudiesPalm Beach County, Florida
Mock•Roos is recognized as one of the premier stormwater modeling firms in south Florida, having modeled thousands of miles of canals and associated watersheds. Our team members have a high level of expertise using a wide variety of stormwater modeling programs.... (more)
Lakes Wellington and Greenview Shores Lake Bank Erosion RestorationWellington, Florida
Lake Wellington and Lake Greenview Shores are man-made lakes located in the middle of Wellington's Basin A and were excavated in the early 1970s. Both lakes are an integral part of Wellington's surface water management system and are 135-acres and 52-acres in size, respectively. These lakes experienced signi.... (more)
Lake Mangonia and Clear Lake Lake Bank Erosion RestorationWest Palm Beach, Florida
Mock•Roos provided the planning, surveying, design and permitting services for lake bank restoration of the shorelines of Lake Mangonia and Clear Lake. In 2009 Mock•Roos performed an investigation to determine the actual shoreline erosion severity and locations, identify potential me.... (more)
|
|